
Add to Cart
Quality zq Series Crane Gearbox Duty Conveyor Belt High Quality Quality Crane Gearbox zq 250 350 650 Conveyor
Brief Introduction
The product is cylindrical geabox with two-stage drive, which is widely applied for crane machinery, mine equipment and general chemical industry. Its working temperature is -40~+45ºC, input rotating speed less than 1500rpm and gear transmission circular velocity less than 14m/s. It can run in forward and reverse direction.China gear box ZQ cylindrical bevel gearbox industrial gear reducer
ZQ gearboxreducer is mainly used for lifting, mining, general chemical, textile, light industry and other industries, its application conditions are as follows:
Structure Features
1. Made of high-quality aluminum alloy, light in weight and non-rusting.
2. Large in output torque.
3. Smooth in running and low in noise
4. High in radiating efficiency.
5. Good looking in appearance, durable in service life and small in volume.
Technical Parameters
Type | ZQ250 | ZQ350 | ZQ400 | ZQ500 | ZQ650 | ZQ750 | ZQ850 |
High-Speed Centre Distance m/m | 100 | 150 | 150 | 200 | 250 | 300 | 350 |
Low-Speed Centre Distance m/m | 150 | 200 | 250 | 300 | 400 | 450 | 500 |
L×W×H Dimension | 540×230×325 | 730×290×405 | 825×310×490 | 990×350×590 | 1280×470×700 | 1450×510×745 | 1630×580×875 |
Weight Kg | 100 | 200 | 250 | 390 | 880 | 1100 | 1500 |
Features of Gear speed reducer:
1.Gear circle velocity ≤20m/s
2.High speed shaft rotation velocity ≤1500r/min
3.Enviromental temperature --40 ~ +45 degree
4.Progressive and retrogressive rotation.
5.Big power and speed damping range.
6.Assemble and adjust easily.
7.The output shaft assimbles in two directions. and used to drive singles or units.
8.Compact structure and small volume with light weight.
9.Operate smoothly with low noise
FAQ:
1. Are you manufacturer or trading company?
Dongtai is a manufacturer focus on gearbox production over 30 years.
2. What is your payment term?
40% T/T in advance and 60% after client inspection before shippment.
3. What is your delivery time?
Generally 30 days based on techncial confirmation, purchase order and advance payment.